Certifications
 
 
  Exports to:
   

Italy
Netherlands
Belgium
France
Greece
UK
Mexico
Australia
Singapore
Malaysia
Turkey
Libya
Kuwait
Dubai
& other countries ..

 

Quality Plan

    Raw Material Inspection Stage
     
    Inprocess Inspection Stage
     
    Final Stage

 
 
 
  Inprocess Inspection Stage  
 
 

INPROCESS  QUALITY  PLAN   REF : QP / 02, Rev 00

ITEMS : FINISHED COMPONENTS OF FITTINGS / VALVES / NIPPLES.
SR NO.
PARAMETER
SPECIFI CATION
MODE OF CHECK
SAMPLE
RESPONSI-BILITY
REACTION PLAN
RECORD REF.
SIZE
FREQU- ENCY
1.1
Visual Finish
As per Master /Controlled Sample
Visual
100%
Every Lot
Q.C. Officer
In case of rejection, Prepare NC Report
Inprocess Inspection Report QC/F/02/00
1.2
Dimensions
a) Length
b) Diameter
c) width 
d) Height
e)A/F
As per Baxcell Drg./ Catalogue or Customer Drg./Sample
Vernier Scale, Bore Plug Gauge, Thread Ring Gauge & Thread Plug Gauge.
As per Sampling plan
Every Lot
Q.C. Officer
In case of rejection, Prepare NC Report
Inprocess Inspection Report QC/F/02/00
Only for Nuts & Ferrules
1.3
Hydrostatic Test
As per applicable Testing procedure /Rating or Customer requirement
Callibrated pressure Gauge
As per Sampling plan
EveryLot
Q.C  Technician
In case of rejection, Prepare NC Report.
Inprocess Inspection Report QC/F/02/00
1.4
Pneumatic Test
As per applicable Testing procedure / Rating  or Customer requirement
Callibrated pressure Gauge
As per Sampling plan
EveryLot
Q.C Technician
In case of rejection, Prepare NC Report.
Inprocess Inspection Report QC/F/02/00